- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Integrated Bulk Power System Risk Assessment Concepts NERC Whitepaper
Integrated Bulk Power System
Risk Assessment Concepts
Executive Summary
In developing methods to measure acceptable levels of reliability, it has become
clear to the Reliability Metrics Working Group that any such measurement of
reliability must include consideration of the risks present within the bulk power
system in order for us to appropriately prioritize and manage these system risks. This document
identifies several categories of system risks against which industry must optimize and, with a focus
on the subcategory of risk events, details a conceptual model depicting these risks. Significant
efforts have been undertaken to determine and quantify the impacts of various historical events for
which metrics may exist; this quantification helps to establish the foundation for measuring system
performance and for considering risk mitigation prioritization. With this model it is expected that
the industry will be better positioned to establish methods for quantifying the various risks within
the system, prioritizing each of those risks and developing methods to optimize impacts against
costs. This work relies heavily upon risk assessment methodologies.
Risk assessment is an essential tool for achieving the alignment between organizations, people and
technology in quantifying inherent risks, identifying where potential high risks exist, and evaluating
where the most significant lowering of risks can be achieved. Being learning organizations, the
Electric Reliability Organization (ERO) along with the Regional Entities and the Registered Entities
can use these tools to focus on the areas of highest risk to reliability and provide a sound basis for
develo
您可能关注的文档
- Controller performance assessment by frequency domain techniques英文资料.pdf
- CQI-12 Coating System Assessment_Final英文资料.xls
- CTE Quality Assessment英文资料.doc
- current methods of tubal patency assessment英文资料.pdf
- Customer Satisfaction Assessment Record英文资料.doc
- Customer Satisfaction Assessment英文资料.doc
- Developing a Building Environmental Assessment System for Slovakia英文资料.pdf
- Development of transplantable human chordoma xenograft for preclinical assessment of novel therapeutic strategies英文资料.PDF
- DISPLACEMENT-BASED SEISMIC ASSESSMENT OF REINFORCED CONCRETE BUILDINGS英文资料.pdf
- Dynamic assessment of children with language impairments A pilot study 2010英文资料.PDF
- GB/T 40096.6-2024就地化继电保护装置技术规范 第6部分:母线保护.pdf
- 《GB/T 40096.6-2024就地化继电保护装置技术规范 第6部分:母线保护》.pdf
- GB/T 43980-2024口译服务 医疗口译要求.pdf
- 中国国家标准 GB/T 43980-2024口译服务 医疗口译要求.pdf
- 《GB/T 43980-2024口译服务 医疗口译要求》.pdf
- GB/T 17215.301-2024电测量设备(交流) 特殊要求 第1部分:多功能电能表.pdf
- 《GB/T 17215.301-2024电测量设备(交流) 特殊要求 第1部分:多功能电能表》.pdf
- 中国国家标准 GB/T 17215.301-2024电测量设备(交流) 特殊要求 第1部分:多功能电能表.pdf
- 中国国家标准 GB/Z 43973-2024非介入式负荷监测(NILM)系统用感知装置.pdf
- GB/Z 43973-2024非介入式负荷监测(NILM)系统用感知装置.pdf
文档评论(0)