毕业设计论文——二进宫版+4资料.doc

  1. 1、本文档共36页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
XX有限公司6t/h燃煤蒸汽锅炉房工艺设计 摘要t/h燃煤蒸汽锅炉房的工艺设计,该公司提供一块60000×20000mm的空地采用台SL6-1.25-WII型蒸汽锅炉,额定工作压力1.25MPa。本锅炉房原水硬度和含氧量不符合锅炉给水要求,需要进行软化和除氧处理。选用两台逆流再生钠离子交换器轮流运行使用。亚硫酸钠除氧GG6-15 No.6.9D的鼓风机与型号为GY6-15 No.10.5D的引风机。 在确定了该锅炉房各项设备的型号后,根据GB50041-2008《锅炉房设计规范》相关技术措施的具体要求,关键词: The design XX CO. LTD.6 t/h coal-fired steam boiler room process Abstract This design is for a hypothetical company 6 t/h coal-fired steam boiler room process design, the company provides a 60000 x 20000 mm of space as a foundation for boiler room. Given in the article through company data and the data required for the calculation of boiler room design, gives a rational of the boiler room equipment selection basis and main equipment models, such as: boiler model, selection of water treatment, air blower, the selection of the induced draft fan, etc. By computing the final decided to adopt 1 SZL6-1.25 - the WII type steam boiler, the rated working pressure of 1.25 MPa. Due to the boiler room raw water for the city tap water, the hardness and oxygen do not conform to the requirements of the boiler feed water, so the raw water to soften and oxygen treatment. Softening system chooses two counter-current regeneration sodium ion exchanger, take turns to run. the advantages of moving bed for water quality is high, can continuous working, convenient operation, less need to exchange dosage. Oxygen way for convenience, choose the sodium sulfite method in chemical oxygen. For fan and induced draft fan, smoke gas and air output, according to the calculated model is respectively chosen for GG6-15 No. 6.9 D blower and models for GY6 - No. 15 10.5 D of induced draft fan. When determining the type of the boiler room equipment, according to GB50041-2008 specification for design of boiler room and related to the specific requirements of the technical measures, determine the size of the different circumstances of boiler room configuration scheme, thus determines the boiler room placement of all equipments and soda pipes, the sm

您可能关注的文档

文档评论(0)

基本资料 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档