m i n n e s o t a d e p a r t m e n t o f t r a n s p o r t a t i o n(m i n n e s o t d e p t m e n t o f t r n s p o r t t i o n).doc

m i n n e s o t a d e p a r t m e n t o f t r a n s p o r t a t i o n(m i n n e s o t d e p t m e n t o f t r n s p o r t t i o n).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Standard Operating Procedures for Weather Events which are beyond the Design Parameters of a Temporary Erosion/Sediment Control Plan AT THE START OF THE PROJECT Put the MN Duty officer’s telephone number in the project proposal (651-649-5451 or 1-800-422-0798). Put the MPCA regional contact person’s name, address, telephone number in the project proposal. Invite the MPCA regional contact person to the pre-construction meeting. WHEN AND EXTRAORDINARY EVENT IS EMINENT The project will be evaluated by Mn/DOT and contract personnel to determine what emergency best management practice measures may be need to be put in place to help minimize an uncontrolled release from the project. AFTER AN EXTRAORDINARY EVENT Inspect the project after the extraordinary event to determine the location and magnitude of uncontrolled storm water release events. Follow up with the MPCA regional contact person within 2 days of an uncontrolled storm water release indicating what happened, what was done and what corrective measures will be taken ( if required). Document the event follow up in the project file. Corrective measures for special waters, as listed in the NPDES permit, will be given high priority in the event of an uncontrolled release. MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARD OPERATING PROCEDURE EXTREME WEATHER EVENTS BEST MANAGEMENT PRACTICES (FOR LOCALIZED FLOODING WITHIN PROJECT LIMITS). CLASSIFICATION Examples Best Effective Uses Strengths Least Effective Uses Limitations EROSION CONTROL (Techniques and products to add texture and cohesiveness to a surface to minimize -- or prevent --erosion from taking place.) Erosion Control Blanket Category 5,6,7 Ditches liners: Plastic Geotextile Rock Slope Protection: Plastic Geotextile Unusual ditch and slope covers. Winter snowmelt. Large Storms Most cost-effective method in preventing the loss of sediment on a project. When installed after the fact Designed for routine events. Not robu

您可能关注的文档

文档评论(0)

bgl001 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档