- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中公教育。给人改变未来的力量
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 14
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts
您可能关注的文档
- “龙湖物业细节式服务品牌建设及盈利模式创新”暨社区OO实战讲座中房商学院.doc
- “掌上安居”智能平台浙江广厦学院施永琴.doc
- 《ERP原理与应用》专科期末复习指.doc
- 。产万吨高清无铅汽油项目.doc
- 《ERP原理与应用》专科期末复习指导.doc
- Ⅰ全局策略篇万科.doc
- “第十二届中国房地产发展会”活动流程.doc
- 《NCCN多发性骨髓瘤临床实践指南》解读.doc
- 《“四个权限上移”实施细则》修订稿原稿.doc
- 。TPM的原理与特征.doc
- 山东省临沂市沂水县2023-2024学年高一下学期期中考试历史试题.docx
- 江苏省泰州市靖江高级中学2023-2024学年高二下学期4月期中考试物理试题(无答案).docx
- 新疆部分名校2023-2024学年高二下学期期中联合考试语文试题.docx
- 湖南省岳阳市岳阳县第一中学2023-2024学年高三下学期4月期中考试数学试题.docx
- 山东省烟台市2023-2024学年高二下学期4月期中生物试题(无答案).docx
- 江苏省靖江高级中学2023-2024学年高二下学期期中地理试题(无答案).docx
- 四川省甘孜藏族自治州某重点中学2023-2024学年高一下学期4月期中考试物理试题.docx
- 湖北省武汉市华中师范大学第一附属中学2023-2024学年高二下学期4月期中英语试题(无答案).docx
- 四川省成都市金牛区成都市实验外国语学校2024年高三三模考试生物试题.docx
- 浙江省宁波市北仑中学2023-2024学年高二下学期期中考试物理试题.docx
文档评论(0)