- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 最新版电大纳税基础与实务缩小版完整版的.doc
- 最新肾癌诊治指南.doc
- 最新房屋装修流程详细版本.doc
- 最新社会心理学论文.docx
- 最新电动车品牌口碑指数榜 新日雅迪爱玛及绿源.doc
- 最新移动客服代表招聘简介大.doc
- 最经典最全最给力的清明节祝福短信.doc
- 月份本网储备稻米交易情况简析.doc
- 最终打印版流通概论期末复习.doc
- 最新统计学原理作业答案.doc
- 宁夏石嘴山市第一高级中学2023-2024学年高一下化学期末综合测试模拟试题含解析.doc
- 辽宁省丹东第四中学2023-2024学年高一化学第二学期期末达标检测试题含解析.doc
- 江苏省苏州高新区一中2023-2024学年高一化学第二学期期末预测试题含解析.doc
- 河北省衡水市阜城中学2024年高一化学第二学期期末考试试题含解析.doc
- 2024届陕西省西安电子科技大附中高一化学第二学期期末检测试题含解析.doc
- 2023-2024学年湖南省湘钢一中化学高一下期末质量检测试题含解析.doc
- 安徽省郎溪中学2024届化学高一下期末考试模拟试题含解析.doc
- 湖北省宜昌市葛洲坝中学2024年化学高一下期末质量跟踪监视试题含解析.doc
- 安徽省长丰二中2024年高一化学第二学期期末质量检测模拟试题含解析.doc
- 2024届重庆市江津区第六中学高一下化学期末监测试题含解析.doc
文档评论(0)