- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
三种生产类型比较(Comparison of three types of production)
三种生产类型比较(Comparison of three types of production)
A brief analysis of ATO, MTO and ETO
The author:
An ERP industry veteran, from nearly 20 years, from the consultant do senior consulting and implementation services director, participate in or responsible for the implementation of dozens of project implementation, until now still continue to engaged in professional work, for manufacturing more study and understand.
Logic analysis, ETO model can better meet the requirements of customers special custom, but ETO mode, manufacturing companies often exist a large number of one-time items, new items and new version of the BOM, new processes, etc., and in the sales quotation, project design, planning, production coordination, supply security is more complicated than the ATO and MTO.
When we talk about manufacturing, we often talk about ATO, MTO and ETO. When it comes to complex manufacturing, these concepts are more likely to be mentioned. In fact, these concepts refer to a production-driven approach. Some manufacturing enterprise is according to predict or market demand and production plan, and then produce the products according to the plan, and sales of the products as much as possible to go out, this way is called MTS (Make to Stock), namely for Stock production. Is, of course, there are also some manufacturing enterprise cant do this, because its product is produced according to customers request to, before did not know the requirements of customers cant produce the final product, or face the consequences of the biggest is likely to be sales out, this type of enterprises can be referred to as made to Order, and depending on the situation, and it can be divided into the ATO (Assemble to Order, Order for assembly), MTO (Make to Order, Order oriented production), ETO (Engineering to Order, according to the Order design). In the face of these several ways to do a rough analysis comparison.
1. ATO (Assemble to Order)
First, it is a production model that better meets custome
您可能关注的文档
- 153机器技巧(153 machine skills).doc
- 15加速度(15 the acceleration).doc
- 15 速度变化快慢的描述—加速度2(Description of the change of speed of 15 - acceleration 2).doc
- 15春西交《工程结构抗震》在线作业满分答案(15 spring xixi engineering structure earthquake seismic online work out of perfect answer).doc
- 15春西交《弹性力学》在线作业满分答案(15 spring xixi elastic mechanics online work perfect answer).doc
- 15春西交《锅炉运行》在线作业 满分答案(The boiler running online work of boiler run is full of perfect answers).doc
- 16-弗莱雷解放教育思想视角下数学新课程(16 - frei liberated education from the perspective of new mathematics).doc
- 16道嵌入式C语言面试题(16 embedded C language interview questions).doc
- 17-核安全与保障(17 - nuclear safety and security).doc
- 18-杂化轨道理论(18 - hybrid orbital theory).doc
- 2024年国网北京市电力公司招聘高校毕业生考试(第一批)公开引进高层次人才和急需紧缺人才笔试参考题库(共500题)答案详解版.docx
- 2024年太原青创招考聘用太原市杏花岭区综合应急大队工作人员公开引进高层次人才和急需紧缺人才笔试参考题库(共500题)答案详解版.docx
- 2024年四川省安州区事业单位招聘55人历年公开引进高层次人才和急需紧缺人才笔试参考题库(共500题)答案详解版.docx
- 2024年天津市农机发展服务中心招考事业单位工作人员公开引进高层次人才和急需紧缺人才笔试参考题库(共500题)答案详解版.docx
- 2024年安徽亳州蒙城县招募特聘动物防疫专员18人历年公开引进高层次人才和急需紧缺人才笔试参考题库(共500题)答案详解版.docx
- 2024年夏福建上杭县事业单位招考拟录人选五公开引进高层次人才和急需紧缺人才笔试参考题库(共500题)答案详解版.docx
- 2024年国网英大国际控股集团限公司招聘约4人历年公开引进高层次人才和急需紧缺人才笔试参考题库(共500题)答案详解版.docx
- 2024年安徽安庆桐城团市委选调工作人员1人历年公开引进高层次人才和急需紧缺人才笔试参考题库(共500题)答案详解版.docx
- 2024年宁波市象山县黄避岙乡人民政府招考编制外人员公开引进高层次人才和急需紧缺人才笔试参考题库(共500题)答案详解版.docx
- 2024年安徽合肥肥西县供销社招聘基层单位工作人员12人公开引进高层次人才和急需紧缺人才笔试参考题库(共500题)答案详解版.docx
文档评论(0)