工程项目业主与承包商协调程序
PROJECT
COORDINATION PROCEDURE
BETWEEN
COMPANY AND CONTRACTOR
INDEX
1. GENERAL
2. ORGANIZATION
3. COMMUNICATIONS CORRESPONDENCE
4. CODING FOR PLANT ENGINEERING AND DOCUMENTATION
5. SCHEDULING PROGRESS REPORTING
6. ATTACHMENTS
GENERAL
Scope
The scope of this coordination procedure is to define:
- the criteria for regulating relations between the parties involved;
general and unequivocal rules concerning the main aspects of project administration and management (i.e. organization, correspondence coding, distribution, reporting, etc).
NOTE: CONTRACTOR to consider this Coordination Procedure as a guideline only.
The Project Coordination Procedure reflects the one used for the BASIC/FEED Engineering. The same apply to the attachments.
The Project Coordination Procedure will be prepared by CONTRACTOR reflecting the content of this procedure as minimum requirements and shall be approved by Company.
Correlation with other Procedures
Identification of the Parties
Project Identification
The following shall be indicated on all types of correspondence and documentation produced to identify the project:
for COMPANY: CONTRACT NUMBER: ……….
for CONTRACTOR: PROJECT NUMBER: ……….
- Short description/reference:
- COMPANY:
Short Project Information
The PROJECT is finalized to provide and install …………………………………………, achieving their successful START-UP and PERFORMANCE TESTING.
Type of Contract
The contract is a LSTK (Lump Sum Turn Key).
The contract includes:
Basic/FEED verification
Detailed Engineering Design
Equipment/materials procurement and testing
Construction and field testing
PRECOMMISSIONING, COMMISSIONING and START-UP
Language
The official language for the project will be English.
Abbreviations
The captions for documents, drawings and correspondence are attached in para 6.
ORGANIZATION
General
The Contract management shall be carried out under the responsibility of the Contractor’s Representative.
The scope of work will be executed on the locations as follow
您可能关注的文档
- 塑料挤出成型过程中存在的质量问题及解决方法.doc
- 塑料模具全部章节题库201012.doc
- 塑胶加工中翘曲变形的原因及解决办法.doc
- 塑胶材料成型部良原因及对策.docx
- 塑料模实训指导书.doc
- 塑料结构基础知识.doc
- 塑料门窗安装及验收规程.doc
- 塑钢门窗检验规程.doc
- 塔吊承载力计算书.doc
- 塔吊桩基承载力计算书(最终版).doc
- 原电池电动势的测定实验报告.pdf
- 与业主、设计、总包、监理和他承包人的配合措施.pdf
- 公司管理流程.pptx
- 2024_2025学年新教材高中地理第1章地球的运动素养综合训练新人教版选择性必修1.doc
- 2024_2025学年新教材高中地理第3章大气的运动第1节常见天气系统第1课时锋与天气分层作业新人教版选择性必修1.doc
- 2024_2025学年新教材高中地理第1章地球的运动第2节地球运动的地理意义第4课时正午太阳高度的变化四季更替和五带划分分层作业课件新人教版选择性必修1.pptx
- 2024_2025学年新教材高中地理第2章地表形态的塑造第2节构造地貌的形成第1课时地质构造与地貌课件新人教版选择性必修1.pptx
- 2024_2025学年新教材高中地理第1章地球的运动问题研究人类是否需要人造月亮课件新人教版选择性必修1.pptx
- 五片小雪花课件.pdf
- 2024_2025学年新教材高中地理第3章大气的运动第2节气压带和风带第1课时气压带和风带的形成分层作业课件新人教版选择性必修1.pptx
文档评论(0)