- 1、本文档共131页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Vision Iowa, CAT amp; RECAT Projects by County精品
Vision Iowa, CAT & RECAT Projects by County
As of June 2015
A B C D E F G H I J K L M O P R S T U V W Adair
Applicant: City of Fontanelle
Project Name: Fontanelle Public Library Expansion
City: Fontanelle (Population 692)
Date of Award: 12/9/2009
Total Project Cost: $364,534
Amount Requested: $50,000
Amount Awarded: $50,000
Project Description: This project is the expansion of the existing library from 2,480 square feet to 4,820 square feet. The existing building will be rehabilitated to make it contiguous with the addition.
Applicant: Greater Greenfield Community Foundation
Project Name: Sports Complex
City: Greenfield (Population 2,129)
Date of Award: 2/11/2009
Total Project Cost: $480,264
Amount Requested: $180,762
Amount Awarded: $180,000
Project Description: The Sports Complex will consist of three soccer fields, three ball diamonds, a walking/bicycling path, parking, playground, picnic area and shelter.
Applicant: City of Stuart
Project Name: Stuart Entertainment & Economic Development Project
City: Stuart (Population 1,712)
Date of Award: 10/10/2007
Total Project Cost: $2,477,567
Amount Requested: $545,000
Amount Awarded: $545,000
Project Description: This project will include the adaptive reuse of the fire-damaged and partially-restored Historic All-Saints building. Formerly a church in the Byzantine style, this facility will be restored into a community cultural center able to hold up to 500 people for concerts, theater, meetings, and weddings.
Applicant: Greater Greenfield Community Foundation
Project Name: Adair County Recreation Center
City: Greenfield (Population 2,129)
Date of Award: 9/17/2001
Total Project Cost: $1,397,703
Amount Requested: $307,414
Amount Awarded: $257,414
Project Description: The recreation center will serve more than 36,000 residents of the Adair County area. The YMCA-managed center will include a gymnasium, walking track, fitness room, therapy pool, racquetball court, game room, locker room and more. The facility will also
您可能关注的文档
- [讲解]电力施工招标文件最终定稿.doc
- [总论]大学英语四级核心词汇700个(高频词).doc
- [知识]大学英语四级核心词汇700个(高频词).doc
- [精品]幼儿园主题活动指导策略.ppt
- [说明]大学英语四级核心词汇700个(高频词).doc
- [小学]同方软科视频点播直播系统.doc
- [汇编]同方软科视频点播直播系统.doc
- “智能数控套料编程系统(InteGNPS)”中文版WORD文档初学者入门指南.doc
- [讲稿]第一章 水利工程建设项目管理概述.doc
- [精品]峨山镇用地置换项目复垦工程.doc
- 仓库保管员述职报告 仓库保管员述职报告总结 (21篇).docx
- 教师高级职称述职报告 教师高级职称述职报告要求字数多少 (17篇).docx
- 加油站经理述职报告 加油站经理述职报告2023年 (17篇).docx
- 销售主管述职报告范文 销售主管述职报告范文大全 (17篇).docx
- 机修班长述职报告 机修班长述职报告 (20篇).docx
- 村干部半年述职报告 村干部半年述职报告 (17篇).docx
- 学生会组织部述职报告 (15篇).docx
- 教师职称评定述职报告 初中教师职称评定述职报告 (17篇).docx
- 信贷述职报告 信贷述职报告怎么写 (17篇).docx
- 入党述职报告范文 入党述职报告范文大全 (19篇).docx
1亿VIP精品文档
相关文档
最近下载
- 聚醋酸乙烯制年产20万吨聚乙烯醇的反应工段工艺设计.pdf VIP
- 基于STM32智能语音垃圾分类系统的设计与实现.docx VIP
- 翻译策略的分类及介绍.docx
- 智慧水务建设项目可行性研究报告.pdf
- 创业基础(暨南)中国大学MOOC慕课 章节测验期末考试答案(期末考试题目从章节测验中选出,题目没对上,可以在章节测验中查找).docx
- 降低长期卧床病人便秘发生率.pptx
- 货物生产、采购、运输方案(技术方案).docx
- 2023浙江省算力产业发展报告.docx
- GB T 16558.7-2009_船舶维修保养体系 第7部分:报表格式_高清版_可检索.pdf
- MTT 1184-2020 露天煤矿剥离采煤安全技术规范.docx
文档评论(0)