- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
AIESEC MoC
oGIP Russia- iGIP MoC
ANALYZES
National Control Board
AUG`13 – AUG`14
The minus comes
from different stages of NPS.
More clear
expectation setting
needs to happen
from OGX
side, for ICX side we need to pay more
attention for
delivery process.
The response rate is not so
high.
From Russia side: will be
better to put NPS
education into EP induction.
From MoC side: we need to
put information in TN form
and during induction process.
PROMOTERS Top issues
Matched stage
Realized stage
Complete stage
Induction to AIESEC
12.7
Logistical support
15.6
Personal Development due to this experience
22.2
Education about The AIESEC Way
7.7
Pick-up
8.9
Adapting fast to new environment
11.7
Education about The AIESEC Experience
7.7
Introduction to the organisation/project
8.9
Understanding better my personal purpose in life
10
Communication effectivity during acceptance procedure
10.8
Accommodation
5.6
Cross-cultural understanding & awareness
9.7
Communication by the Home LC
4.3
Cultural preparation
9.4
Awareness about local culture
1.7
Communication by the Host LC
3.8
Resource/contact sharing for cultural preparation
3.3
Living diverse cultures and having a multi-cultural experience
1.7
Intergration by the hosting entity
9.4
Cross-cultural working experience
1.7
Information provided about the GIP programme
9.8
Integration into the local culture
3.3
Professional working environment
4.2
Exchange participant responsibilities & programme policies (XPP)
7.7
Role and responsibilities within the organisation
6.7
Programme benefits explanation
1
The working environment of the organisation
1.7
The selection process
9.8
AIESEC’ support during the experience
9.7
Communication and clarity around the process
7.7
Support by host entity during the experience
6.7
Matched stage
Realized stage
Complete stage
Visa documents and information
-7.8
Job-description clarity and alignment
-25
AIESEC’ support during the experience
-34.2
Information about the visa process
-6.3
Job-desc
您可能关注的文档
- 08物联网通信与射频识别技术.pdf
- mips数字标牌信息系统v210用户使用手册.pdf
- 文稿教程力学第1绪论.pptx
- 概率论与数理统计区间估计.pptx
- 化妆品相关的皮肤科学.pptx
- 讲稿市面演艺分类.pptx
- pk新旧satwe计算和广厦gssap新计算结果对比8a.pdf
- 云南支付宝服务窗产品介绍打.pptx
- 学渣班5月第三次.pdf
- 回头客自助点餐系统简介2015年版本b.pptx
- GB/T 40096.6-2024就地化继电保护装置技术规范 第6部分:母线保护.pdf
- 《GB/T 40096.6-2024就地化继电保护装置技术规范 第6部分:母线保护》.pdf
- GB/T 43980-2024口译服务 医疗口译要求.pdf
- 中国国家标准 GB/T 43980-2024口译服务 医疗口译要求.pdf
- 《GB/T 43980-2024口译服务 医疗口译要求》.pdf
- GB/T 17215.301-2024电测量设备(交流) 特殊要求 第1部分:多功能电能表.pdf
- 《GB/T 17215.301-2024电测量设备(交流) 特殊要求 第1部分:多功能电能表》.pdf
- 中国国家标准 GB/T 17215.301-2024电测量设备(交流) 特殊要求 第1部分:多功能电能表.pdf
- 中国国家标准 GB/Z 43973-2024非介入式负荷监测(NILM)系统用感知装置.pdf
- GB/Z 43973-2024非介入式负荷监测(NILM)系统用感知装置.pdf
文档评论(0)