[湖南]5万吨净水厂给排水工艺全套图纸(给水工程初步设计附170页计算说明和CAD图纸)【毕业论文+CAD图纸全套】.doc

[湖南]5万吨净水厂给排水工艺全套图纸(给水工程初步设计附170页计算说明和CAD图纸)【毕业论文+CAD图纸全套】.doc

  1. 1、本文档共171页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
买文档就送您CAD图纸,Q号交流11970985或401339828

X1市给水工程初步设计 摘 要 X1市位于湘南省西部,是一个古老而美丽的城镇,位于溆水中游,近期规划人口12万人,远期发展到20万,市区已建了一座3万m3/d的水厂。随着经济的发展、用水量的增长,现有供水能力已满足不了正常的生产和生活所需。根据城市总体规划,拟在溆水上游建设一新水厂。新水厂建成后,与老厂联合向管网供水,形成统一供水的局面。 本设计的主要内容包括:取水构筑物设计;净水厂设计;输配水管网设计;工程概预算四部分。 根据城市管网供水的需要,计算得新水厂近期供水规模为5万m3/d,远期为10万m3/d。为保证出水水质,所以新水厂处理工艺采用常规处理+深度处理(臭氧-生物活性炭),增加深度处理后,能使出厂水水质明显提高。工程建设总投资为 9373.65万元,单位制水成本为0.85元/。 关键词:取水构筑物,净水厂,常规处理工艺,V型滤池,配水管网,概预算 Abstract As an ancient and beautiful city, X1 city is located in the west of Hunan. On the middle reaches of Xu River, the city has a planning population of 120,000 which, in long term, will be expanded to 200,000. There has already been a 30,000 m3/d waterworks in the downtown area. With the development of economy and the increasing demand of water, its current water supplying capacity can not meet the requirement of regular production and people’s daily life. According to the city’s comprehensive planning, it is proposed that a new waterworks should be constructed on the upper reaches of Xu River. When it is completed, the new waterworks will be joined by the old one to supply water to the pipe network, thus making a state of unified water supply. This design mainly covers four parts which are: the water intake works, the purification plant, the tubeweb system of carrying and providing water, and the budgetary estimation of the design. According to the demand of the pipe network, it is calculated that the short-term water supply scale of the new waterworks is 50,000m3/d and the long-term one is 100,000m3/d. The water treatment process of the new water treatment plant introduces both the conventional treatment and the advanced treatment so as to remove the hazardous substances; Adding advanced treatment, the quality of the effluence will be improved obviously. The total investment of the design is 93,736,500Yuan and the cost analysis per unit is 0.85Yuan /m3. Key words: water intake works, purification plant,routinely processing,V-shaped filter chamber,water distribution n

文档评论(0)

***** + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档